Selected work

Greenfield build

Concept to live in two weeks

A customer-facing app with nothing behind it — no design, no code, no environment — went from conversation to production in two weeks.

Goods receipt — handheldPO-5182
Demo data
Device: warehouse scannerstep 2 of 4
Receive against
PO-5182 · Kestrel Mills
Scan carton
CTN 018 / 024Ready to scan
Waffle knit 280gsm1,150 / 1,200
Rib collar 2×21,200 / 1,200
Main label, woven1,200 / 1,200
50 pcs short on one line. Flagged to sourcing before cutting.
Offline-tolerant · queues and syncs on reconnect
Receiving module — the handheld flow, built mobile-first because the device in the warehouse is a phone. Demonstration data throughout.
Function
Greenfield product build
Scope
Design through deployment
Interface
Mobile-first, guided inputs
Elapsed
Two weeks to live
Case note

The problem

The starting point was an idea and a deadline. There was no existing system to extend, which removes a lot of constraints and adds one: everything — the interface, the logic, the hosting, the domain — has to be decided and built inside the same window.

What we built

A customer-facing web app with a guided input flow rather than a bare form, because the people using it would be entering something they only half understood and a blank field would have stopped them.

Mobile-first throughout — the expected device was a phone, so the phone layout was the design rather than a narrowed version of the desktop one. Deployment into a live production environment was part of the two weeks, not a step afterwards.

How it landed

It went live inside the window, in front of real users. This is the pattern behind how we start: a working slice deployed into a real environment inside a couple of weeks tells you far more about whether a build is worth doing than a longer document would.

Anonymised by agreement. We'll walk you through the specifics — the system, the numbers, the parts that went wrong — on a call under NDA.

Next

Cut sample costing from days to minutes

Sourcing & costing

Start here

Tell us which process is costing you the most.

One process, one week inside it, and a straight answer on whether you should build anything at all.